The following instructions pertain to the installation of fraser wood siding evolution series on a typical wood frame construction allowing for nail penetration of 1 min through the siding into solid wood every 16.
Fraser siding installation instructions.
Otherwise the wall will not be properly ventilated figure 5.
You begin to install the siding.
The distance between the centers of the laths must be equal to the width of the exposure.
If there is something you need and it s not addressed below please feel free to contact us toll free.
The hidden nail system provides a cleaner look by virtually eliminating the need for face nails.
Install the ventilated metallic starter strip directly on the furring strips.
Best practices for successful results vinyl siding installation manual created by the vinyl siding institute vsi this manual includes installation instructions based in part on astm d4756 standard practice for installation of rigid pvc siding and soffit.
Sip panels 1x3 kd actual 1 thickness strapping should be installed at 16 o c to give 1 of solid wood for nail penetration.
The bottom of the furring strips.
If your construction is of a different type please call fraser at 1 866 630 2495 for installation instructions.
To align the shingles tack a board temporarily to the roof or draw a straight chalk line.
Lap bottom sill plate by repairs and touch ups the following must be sealed using a minimum of two coats of fraser.
Nail horizontally every 16.
Hingles must alw ays be nailed to 1 x 3 2 5 cm x 5 cm w ooden laths or a cedar breather t ype product installed according to the instructions included.
Home shingle installation we ve compiled the most frequently asked questions for our contractors architects and dealers to help you find what you re looking for.
If there is a horizontal furring strip it must be removed.
Away from foundation.
Space siding or skirt board min.
Failure to follow the installation instructions would void the warranty.
Proper wall preparation ventilation and installation including proper nail size and nailing pattern is key to having the siding perform it s best.
Fraser evolution series makes installation a breeze by locking in every board on all four sides.
Evolution series installation guide.
Top bottom and both sides.
End to end siding joints no longer need to end on strapping furring studs.
To get all the benefits of vinyl siding ensure proper installation.