Starting at one end of the new wall shim between the top plate and ceiling and check the wall for plumb with a level.
Framing roof to wall.
In wood framing basics and wall plans that have openings with cripples above the header cut and nail together the king studs and trimmers first.
Nail the end studs to framing in the existing wall.
Because most roof flashing is required to extend up the wall a minimum of 4 and some a minimum of 5.
This will the first point of the rafter measurement line.
Most simply use a nominal 6 piece of lumber.
Proper flashing is crucial at a roof to wall intersection.
The roof flashing is then placed up behind this through the wall z bar flashing on the outside of the vertical blocking backing material.
Fasten the bottom plate by driving 16d nails through it into the floor.
The roof framing must also function as part of the roof diaphragm to transfer lateral loads to the shear walls below.
Measure out each plumb cut.
Input the pitch of the roof that you calculated above we ll use 7 12 for reference throughout on the framing square.
Then position and nail them to the plates.
From one end of the rafter material using a speed square or framing square mark an x in 12 angle on the rafter and cut it.
The basic steps include.
At this point you will brace the wall while you stand up against the adjacent walls and square them up before nailing them together.
To limit the amount of drywall that has to be replaced use a ruler and pencil or a chalk.
Metal flashing prevents rain and run off water from seeping into the space between the roof and the wall and causing damage to the framing.
Fasten the wall into place.
Roof framing doesn t have to be daunting but if it s your first try a simple gable roof say on a garden shed is the best bet.
Some carpenters like to make this.
Double the studs at the ends of the walls and around any doors or windows before standing up the framed wall.
Line up the square with the pitch end of the chord and mark the line with a pencil.
Measure down y height from the long point of the rafter cut and make a mark.
Remove the temporary collar ties.
As you shim and plumb each section of wall drive 16d nails through the top plate into the framing with a hammer or nail gun.
Then measure and nail the cripples into place.
Roof framing rafter layout.
The roof framing must support the roof decking and sheathing and resist loads applied to the sheathing and transfer loads vertically to support walls or frames.
Set the header on the trimmers and nail through the king studs to hold it in place.