Secure the drip edge at the areas where leaks were noted by driving 1 1 4 inch roofing nails through the surface at.
Fix drip edge roof detail.
Tools supplies tin sn.
Lift courses or shingles from the asphalt adhesive strip on the course beneath it to inspect the.
This is important to protect damage to your fascia soffits rafters.
It is used to hold the underlayments down and create a watertight seal around the edge of the roof.
Installing drip edge on your roof.
To install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first.
The roof leg should extend a minimum of 2 back onto the roof sheathing.
With without rain gutters.
Install the eave strips on the lower roof edges first with the eave strips under the shingles and felt underlayment.
To locate rotted areas of the roof s edge gently lift up shingles with a pry bar or taping knife.
Use a metal snip to divide the portions of the drip edge in accordance with your measurements.
Lift up roof shingles and nail the eave strip in place with galvanized roofing nails.
Save yourself some.
Align one end of the lower eave strip even with the edge of the roof decking.
While the vertical leg should be placed 1 4 1 2 away from the fascia.
T shape drip edge is an l shaped flashing in which the long leg folds back on itself before heading down 90 degrees to form the short leg.
L shape drip edge is a simple 90 degree bend with a flare out at the bottom of the short leg.
Custom color drip edge must be decided on a few weeks ahead of time to allow the lead time it will take a metal shop to fabricate the flashing.
How to fix a roof drip edge installing roof drip edge flashing properly.
Install roof drip edge along the eaves add underlayment then place drip.
With the first section place the strip toward the edge of the fascia at the point where the titled border reaches the parallel side.
Place the metal roof drip edge flashing along the gable ends.
Drip edge roof flashing types.
The drip edge should be installed on top of the underlayment at all rakes and below or on top of the underlayment at the eaves.
Drip edge is installed around the whole perimeter of the roof.
Once all the underlayment is applied go back and place.
At the eaves when installing the drip edge on top the underlayment a 4 inch wide layer of asphalt roof cement complying with the astm d4586 type i or type ii is required.